Fastener Tray Curing System:  PII nears completion of a 12,000 lbs/hour Dip Spin automated tray curing system.   Click for more info >

Perceptive Industries awarded European contract for a turnkey Tandem Tin Plate Coating Line: PII recently received a contract for a complete tin plate coating line for a large manufacturer of cans in Europe.  Click for more info >


 

SunChemical
 

AIR/AIR HEAT RECOVERY

PRODUCT:  PIGMENT

  PROCESS:  SPRAY DRYING SYSTEM

  EXHAUST AIR:  21,000 SCFM

  TEMPERATURE:  203 ºF

Sun Chemical Heat Recovery case study
Click to enlarge

ORIGINAL SYSTEM SCHEMATIC


Click to enlarge

SYSTEM TESTING

 

OCTOBER 2006

Supply Air Flow

Exhaust Air Flow

System Temperatures

Systems Pressure

 
THERMAL RECOVERY POTENTIAL
Click to enlarge

ORIGINAL FEASIBILITY REPORT
 

  ØPredicted Heat Recovery Savings Of $140,000 To $200,000 Per Year
  ØPredicted Equipment Payback Period Of 1.5 Years
 

 

 
SCOPE OF WORK
 
ØHeat Recovery Wheel
ØSupply Ductwork
ØExhaust Ductwork
ØExhaust Air Filter Box
ØStructural Steel & Structural Platform
ØElectrical Panel, Local Devices, VFD
ØElectrical Installation
ØMechanical Installation (By Customer)

 

 
DESIGN HEAT RECOVERY
Click to enlarge
SYSTEM ISOMETRIC VIEW
Click to enlarge
ACTUAL HEAT RECOVERY
Click to enlarge

HEAT RECOVERED
Flow Rate = 21,000 SCFM
ΔT=(189.6-89.9)=99.7
Heat Recovery=21,000x99.7x1.1=2.3 Million BTU/Hr

 
HEAT AVAILABLE FROM GAS
 
GAS SAVINGS
 
ØBest Case Of 90% Available Heat
ØGross Heating Value Of 1,000 BTU/CF
ØUse Current Price of $10.00/1,000 CF

ØGAS SAVINGS:

 

Ø  2,300,000     x  $10.00  =  $25.56 per Hour

  1,000 x 0.90        1,000

 

 
CONSUMPTION
 
ØAdded System Pressure Drop Due to Wheel Of
2 Inches W.C.
ØAdditional Exhaust Fan HP Required of 11 BHP (8.2 Kw)
ØWheel Drive Motor HP Of 2 HP (1.5 Kw)
ØIncluding Control Panel, Increase of 10 Kw Power Requirement

Ø10 Kw @ $0.075/Hour = $0.75/Hour Cost

 
ELECTRICAL
ANNUAL SAVINGS

 

Equipment Operating Hours:

Ø345 Days x 24 Hrs/Day   =   8,280 Hrs/Year
ØNatural Gas Savings:  $25.56 per Hr
ØExtra Electrical Cost:  $  0.75 per Hr
ØNet Hourly Savings:  $24.81 per Hr
ØANNUAL SAVINGS:= $24.81 X 8,280=$205,427
 
EQUIPMENT PAYBACK
 
ØEquipment Cost:  $ 215,000
ØInstallation Cost:  $   85,000 (Mechanical/Electrical)
 

ØTotal Cost:  $ 300,000
 

Ø  PAYBACK:
Ø$300K/$200K per Yr =  1.5 Years
 

10 YEAR OUTLOOK

Ø10 Year Gas Savings:  $2,000,000
ØSystem Initial Cost:  $   300,000
ØBottom Line: $1,700,000

 

 

INSTALLATION PICTURES

 
ENERGY CONSERVATION WHEEL
THE COMPONENTS
THE ROOF
THE LIFT
THE JUNGLE